Turn your requirements and business rules into compliant, defensible documents.
Automate, yes, but… In 3 months, could you defend your document to a customer or an auditor?
Technical proposals, quality documents, marketing authorisations: precise documents to produce, where every line must be justifiable.
Syntelier lets you automate them from your own rules and the rules of your trade.
The rules of the trade
- Applicable standards and regulations
- Good practice in your industry
- The texts in force, at the right date
Every rule cites its text and its article.
Response to the specification
3.1 Data integrity. Compliant. Dedicated automation workstation, 21 CFR Part 11 compliant, priced separately.
4.2 Noise level. Deviation: 80 dB(A) guaranteed at 1 m, enclosure offered as an option.
7.2 Filling from the customer’s drums. Left to your sales engineer.
9. Pricing and options.
◆ R-21Your rule
IF requirement cites “21 CFR Part 11” → automation workstation, priced separately
Same as job 83, pharma customer, 2023. Extra cost: €18k.
◆ R-08Your rule
IF required noise < 80 dB(A) guaranteed → deviation declared AND enclosure option
Same as job 61, nuclear customer, 2022. Extra cost: €9k.
Your call
No rule, no past job: your sales engineer makes the call
- Machine technical file M-24
- M01 Hydraulic motor, 4 kW
- Datasheet.pdf
- Hydraulic oil SDS.pdf
- Q02 Motor circuit breaker
- EU declaration.pdf
- Request to manufacturer.eml
- Y03 Pneumatic cylinder, ATEX zone
- ATEX certificate.pdf
- Document register.xlsx
◆ R-02Trade rule
IF family = motor → document due: datasheet
Regulation (EU) 2023/1230, Annex IV.
◆ R-07Your rule
IF energy = hydraulic → contains oil → document due: SDS
Same as job 47, nuclear customer, 2024. Acceptance held for 3 weeks.
◆ R-11Trade rule
IF EU declaration cites 2006/95/EC → repealed text → request again
2006/95/EC repealed by 2014/35/EU.
◆ R-12Trade rule
IF zone = ATEX → document due: ATEX certificate
Directive 2014/34/EU (ATEX).
Your call
The category required in this zone: you set it
Study summary, substance A
| Batch | Condition | Duration | Content |
|---|---|---|---|
| 3 | 40 °C | 6 months | 0.12% |
Protocol deviation. Temperature out of range, days 12 to 14: deviation reported, impact on results assessed.
Conclusion. Left to your expert.
References.
◆ R-05Your rule
FOR EACH value → substance, batch, condition, duration, unit: filled in
Same as report 2024-17, corrected by your expert.
◆ R-09Trade rule
IF protocol deviation → reported in the summary AND impact assessed
OECD Principles of GLP.
Your call
Key point: the conclusion is your expert's call
Your own rules, customisable
- Your know-how and your past jobs
- Your estimating rules
- Your internal requirements and templates
Made explicit with you or understood by Syntelier from your documents, and adjustable by your team.
Requirements pile up, and flow down to you.
-
1. Rules piling up
≈ 13,000
EU acts in five years
Against ≈ 3,500 in the United States. Machinery Regulation (2027), battery passport (2027), carbon border adjustment (2026)…
-
2. Down to the supplier
360
requirements in a single specification
To replace a machine from 2009: a €100k project, at an 80-person supplier.
-
3. On the same team
300 to 600
documents to supply for this one machine
More requirements to price, more evidence to provide, and no one extra to do it.
Sources: M. Draghi, The future of European competitiveness, 2024; Regulations (EU) 2023/1230, 2023/1542 and 2023/956; real cases, 2026
“We greatly appreciated Syntelier's professionalism and commitment throughout this collaboration. We were also particularly impressed by their ability to grasp the complexity of our activities and our requirements.”
Try it on one of your documents.
Write to us to see Syntelier save you time, and raise the quality of your documents.