From the bill of materials to the complete technical file.
Get every machine signed off by turning your bill of materials and business rules into complete, defensible technical files.
BOM → your technical file
1Your sourcesBOM, machine M-24
- Hydraulic motor, 4 kWtag M01
- Motor circuit breakertag Q02
- Pneumatic cylinder, ATEX zonetag Y03
2Your rulesapplied by Syntelier
3Your machine technical fileretrieved via manufacturer access
- M01 – Datasheetp. 1◆ R-02
- M01 – Oil safety data sheetp. 1◆ R-07
- Q02 – EU declaration: cites 2006/95/EC, repealedp. 1To request
- Y03 – ATEX certificate: required category—Your call
What you gain
- Gaps known before acceptanceEvery missing document identified; one message ready per supplier.
- Documents read, not just foundAn EU declaration read down to the directives it cites; an ATEX certificate, down to the type certificate.
- You keep the signatureWhether a document is acceptable, and signing the file, remain yours.
From 3–4 days to 10–15 minutes, per job.
At a special machine builder, in production: the file used to be assembled by hand, part number by part number.
Special machine builder, 2026
3 to 4 days→10 to 15 minto finalise most of the file after delivery- up to 96%of valid documents retrieved
At your scale, roughly
documents to collect per year
An example: replace with your own figures and the total updates.
The method
Nothing to install: your bill of materials, as it is.
Up to 700 components, as it is.
Syntelier prepares◆ with your rules
-
01
Classify each component
Family, energy, zone: from the description and the part number.
- Classify
IF description contains “hydraulic motor” → family = motor, energy = hydraulic
- Classify
-
02
Determine the documents due
CE, UL, ATEX, IECEx, pressure equipment, REACH, safety data sheet.
- Deduce
IF energy = hydraulic → document due: oil SDS - Your customers' requirements
IF customer requires EN 10204 3.1 → material certificate due
- Deduce
-
03
Manufacturer access
Queried automatically, part number by part number. Every document retrieved is read.
- What counts as evidence
IF declaration cites a repealed text → request again
- What counts as evidence
- What you decide
Parts of the machine in an ATEX zone → decision: you
Up to 5 documents per component, each sourced; one message ready per supplier.
Next: the maintenance plan →Your questions on the machine technical file.
What does a machine technical file prepared by Syntelier contain?
For each component in the bill of materials, the documents your rules require: datasheet, safety data sheet, and the CE, UL, ATEX, IECEx, pressure equipment or REACH documents that apply, plus an EN 10204 3.1 material certificate when your customer requires one. Up to 5 documents per component, each sourced and filed by tag.
How long does it take to assemble the technical file for a job?
At a special machine builder, the file used to be assembled by hand in 3 to 4 days per job. With Syntelier, most of the file is finalised in 10 to 15 minutes after delivery, with up to 96% of valid documents retrieved.
Are the documents retrieved actually checked?
Yes. Syntelier reads every document it retrieves: an EU declaration down to the directives it cites, an ATEX certificate down to the type certificate. A declaration citing a repealed text is flagged, to be requested again.
What happens when a document is missing?
The gap is identified before acceptance, with a message ready for each supplier. On gaps and borderline cases, you make the call: whether a document is acceptable, and signing the file, remain yours.
Try it on one of your bills of materials.
Write to us to see Syntelier prepare the technical file for one of your bills of materials, live.